Water Tight Threaded Conduit Hub

Product Details
Customization: Available
After-sales Service: 24 Months Quality Guarantee Since Shipment
Warranty: 24 Months
Still deciding? Get samples of US$ 0/Piece
Request Sample
Gold Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Product Certification
The supplier's products already have relevant certification qualifications, including:
UL
to see all verified strength labels (24)
  • Water Tight Threaded Conduit Hub
  • Water Tight Threaded Conduit Hub
  • Water Tight Threaded Conduit Hub
  • Water Tight Threaded Conduit Hub
  • Water Tight Threaded Conduit Hub
  • Water Tight Threaded Conduit Hub
Find Similar Products

Basic Info.

Model NO.
C-1-C-9
Standard
UL 514b
Technique
Casting
Nominal Diameter
UL
Type
Threaded Union
Material
Zinc
Connection
Male
UL Listed
E472251
Transport Package
in Cartons
Specification
1/2" up to 4"
Trademark
EVT
Origin
Zhejiang, China
Production Capacity
10000000PCS/Month

Product Description

Conduit Hub:
1) Zinc Die Cast
2) Insulated Throat in red or any other color
3) Secures threaded rigid service entrance conduit to box or enclosure
4) Size: 1/2" to 4"
5) UL listed, E472251
Water Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit HubWater Tight Threaded Conduit Hub
Water Tight Threaded Conduit Hub
 
Company name HANGZHOU EVT ELECTRICAL,.CO.LTD
Nature Manufacturer
ISO ISO 9001:2015
Stuff 100 workers
Shipping port NINGBO OR SHANGHAI
Payment term 30%T/T deposit, balance against copy of B/L
Production cycle 3-4weeks
Delivery time Around 4weeks after received your deposit
Packagings According to your requirement

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier